微博
加入微博一起分享新鲜事
登录
|
注册
140
Mechanism and experiment of substituting high drainage roadway with directional long drilling group to extract pressure-relief gas https://journal.hep.com.cn/jocsu/EN/10.1007/s11771-012-1315-8
请登录并选择要私信的好友
300
Mechanism and experiment of substituting high drainage roadway with directional long drilling group to extract pressure-relief gas https://journal.hep.com.cn/jocsu/EN/10.1007/s11771-012-1315-8
赞一下这个内容
公开
分享
获取分享按钮
正在发布微博,请稍候