微博
加入微博一起分享新鲜事
登录
|
注册
140
Grasping institutional complexity in infrastructure mega-projects through the multi-level governance system: A case study of the Hong Kong-Zhuhai-Macao Bridge construction https://journal.hep.com.cn/fem/EN/10.15302/J-FEM-2018074
请登录并选择要私信的好友
300
Grasping institutional complexity in infrastructure mega-projects through the multi-level governance system: A case study of the Hong Kong-Zhuhai-Macao Bridge construction https://journal.hep.com.cn/fem/EN/10.15302/J-FEM-2018074
赞一下这个内容
公开
分享
获取分享按钮
正在发布微博,请稍候